Utilities > Base stations

Nokia selected to deploy 4G and 5G equipment in India

21 November, 2024

Nokia has been awarded a multiyear extension deal by Bharti Airtel to deploy 4G and 5G equipment across key Indian cities and states.


Nokia wins deal to deploy 5G in Vietnam

10 October, 2024

The ambitious project will cover 22 provinces across the country and support Viettel Group's strategy of advancing 5G infrastructure and digital transformation.


Nokia to deploy 5G in Argentina, expand coverage in Brazil

25 September, 2024

Nokia has signed a comprehensive deal to deploy 5G infrastructure across Argentina, as well as a second deal to expand its 5G RAN coverage across 15 states in Brazil.


Spectrum sharing between a HAPS and terrestrial base station

03 September, 2024

A field trial by SoftBank has successfully demonstrated the use of nullforming technology to achieve spectrum sharing between a HAPS and a terrestrial base station.


World's southernmost base station operating in Antarctica

23 August, 2024

The primary motivation behind the project was to provide essential mobile coverage to the Norwegian Polar Institute's Antarctic research station, Troll.


Nokia enters partnership to bring 5G to Egypt

20 August, 2024

The collaboration between Nokia and Telecom Egypt aims to introduce the transformative power of 5G to cities including Alexandria, Aswan, Cairo, Giza and Luxor.


Hydrogen generators deployed at vulnerable mobile towers

01 August, 2024

Energys and Telstra have commissioned five hydrogen-powered backup generators at critical regional mobile phone towers around Victoria, the last of which came online in early July.


Nokia and Claro collaborate on Colombia's largest 5G network

25 July, 2024

Nokia and Claro have successfully completed the first stage of Colombia's largest 5G deployment, covering over 1000 sites nationwide.


Optus prepares to deploy multi-operator 5G Radio Dot System

27 March, 2024

The multi-operator Ericsson Radio Dot System will provide high-capacity 5G connectivity indoors, enabling Australian enterprises to offer high-speed, ultralow latency.


Telstra and Eutelsat OneWeb deploy LEO backhaul in Australia

20 February, 2024

As part of the rollout of LEO cellular backhaul, Telstra conducted an on-air voice call using Eutelsat OneWeb's LEO solution at a site in Oxford Falls, Sydney.


Govt begins process to upgrade Central Coast base station

02 November, 2023

The Australian Government is working to improve communications resilience on the Central Coast by launching a process to upgrade the Telstra mobile tower at Yarramalong.


Improving efficiency for base station interoperability testing

31 July, 2023

NEC and Fujitsu are investigating technology for testing the interoperability of post-5G base stations compliant with O-RAN specifications.


ZTE Dynamic RIS 2.0 product for 5G-A

28 June, 2023

Reconfigurable Intelligent Surface (RIS) utilises programmable, two-dimensional metamaterials along with phase control components to achieve signal propagation, direction regulation and interference suppression in three-dimensional space.


DAMM TETRA solution chosen for new Indian airport

07 June, 2023

A new international airport under development in India will deploy a unified radio communication solution with DAMM high-capacity BS418 base stations at its core.


Nokia to deploy 5G-ready network in Algeria and Tunisia

11 May, 2023

Nokia has been selected by Ooredoo Group to upgrade its existing radio access networks (RAN), as well as to deploy new sites in Algeria and Tunisia.


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd